Baker River Hydroelectric Project 2011 Annual Reports

 

 

2011 Annual Report FERC transmittal letter

 

BAKER SA 601 Baker River Coordinating Committee

BAK SA 601 Annual Report 2011.pdf

 

BAKER LA 410 Threatened Endangered and Sens Species Plan

BAK LA 410 Annual Report 2011.pdf

 

BAKER SA 101 Fish Propagation

BAK SA 101 Annual Report 2011.pdf

BAKER SA 102 Aquatics Reporting

BAK SA102 Annual Report 2011.pdf

BAKER SA 103 Upstream Fish Passage Implem Plan

BAK SA 103 Annual Report 2011.pdf

BAKER SA 104 Connectivity Between Lk Shannon and Baker Lk

BAK SA 104 Annual Report 2011.pdf

BAKER SA 105 Downstream Fish Passage Implem Plan

BAK SA 105 Annual Report 2011.pdf

BAKER SA 106 Flow Implementation

BAK SA 106 Annual Report 2011.pdf

BAKER SA 108 Gravel

BAK SA 108 Annual Report 2011.pdf

BAKER SA 109 Large Woody Debris

BAK SA 109 Annual Report 2011.pdf

BAKER SA 110 Shoreline Erosion

BAK SA 110 Annual Report 2011.pdf

 

BAKER SA 201 Programmatic Agreement

BAK SA 201 Annual Report 2011.pdf

Supporting Documents

Attachment 1, HPMP Approval

Attach 1_FERC approval.doc

Attachment 2, Lower Baker Floating Surface Collector

20110120 BAK LA 404 LBK FSC Investigation Results.pdf

20120712071308016.pdf

Attachment 3, Lower Baker Powerhouse

Att 1_Big gulch steps.jpg

Att 1_LB Trail Construction Proposal.pdf

Att 2_Hillside Conduit Layout.pdf

Att1_LB Access Tr dwgs2.pdf

CRAG_ltr_trail.pdf

Fig 1_PSE Trail.pdf

Fig 2_Surveyed areas.pdf

Attachment 4, Alder Creek

Cover_AlderCreek.pdf

Attachment 5, Horseshoe Cove

20110726105501469.pdf

Attachment 6, Baker Club House

042511-45-FERC_042511_1.pdf

Attach 1Powerhouse.jpg

Attach 2.pdf

Preservation plan.pdf

Unit 4 Trailers Note to CRAG Ltr Final.pdf

Attachment 7, Lower Baker Cottage

102411-04-FERC_102411.pdf

CRAG review.htm

Attachment 8, Lower Baker Parking Lot

08101114.pdf

CRAG_ltr.pdf

Attachment 9, Burpee Hill

CRAG_ltr_72111.pdf

RE Baker River- APE proposed for Burpee Hill Project (UNCLASSIFIED).txt

RE Baker River Project Cultural Resource Assessment for Burpee Hill RD Project (UNCLASSIFIED).txt

Attachment 10, Baker Swim Line

20110517 - CRAG SUMMARY ARCH MONITORING HCSLDP LTR.pdf

Attachment 11, Concrete Heritage Museum

DSC_0060.JPG

DSC_0066.JPG

LB Dam Historical Photos Conservation Report .pdf

Attachment 12, Annual Monitoring

Monitoring Table_2011.pdf

 

BAKER SA 301 Recreation Management Report

BAK SA 301 Annual Report 2011.pdf

BAKER SA 302 Aesthetics Management

BAK SA 302 Annual Report 2011.pdf

BAKER SA 303 Baker Lake Resort Redevelopment Plan

BAK SA 303 Annual Report 2011.pdf

BAKER SA 304 Baker Reservoir Rec Water Safety Plan

BAK SA 304 Annual Report 2011.pdf

BAKER SA 305 Lower Baker Developed Recreation

BAK SA 305 Annual Report 2011.pdf

BAKER SA 306-310 312-314 316 Funding

BAK SA 306 Annual Report 2011.pdf

BAKER SA 318 Law Enforcement

BAK SA 318 Annual Report 2011.pdf

 

BAKER SA 401 Water Quality

BAK SA 401 Annual Report 2011.pdf

Supporting Documents

20120628-2011 Annual Water Qty Rpt RevDraft ltr.pdf

BAK SA 401 Annual Report 2011 - RevDraft.pdf

Baker River Project Water Quality Data - 2011.xls

 

BAKER SA 501 Terrestrial Resource Mgmt Plan

BAK SA 501 Annual Report 2011.pdf

BAKER SA 502 Forest Habitat

BAK SA 502 2011 Annual Report.pdf

BAKER SA 503 Elk Habitat

BAK SA 503 Annual Report 2011.pdf

BAKER SA 504 Wetland Habitat

BAK SA 504 Annual Report 2011.pdf

BAKER SA 505 Aquatic Riparian Protec Restor and Enhanc Plan

BAK SA 505 Annual Report 2011.pdf

BAKER SA 506 Osprey Nest Structures

BAK SA 506 Annual Report 2011.pdf

BAKER SA 507 Loon Floating Nest Platforms

BAK SA 507 Annual Report 2011.pdf

BAKER SA 508 Noxious Weeds

BAK SA 508 Annual Report 2011.pdf

BAKER SA 509 Plants of Special Status

BAK SA 509 Annual Report 2011.pdf

BAKER SA 510 Carex flava

BAK SA 510 Annual Report 2011.pdf

BAKER SA 511 Decaying and Legacy Wood

BAK SA 511 Annual Report 2011.pdf

BAKER SA 512 Bald Eagle Night Roost Surveys

BAK SA 512 Annual Report 2011.pdf

BAKER SA 513 Bald Eagle Management Plans

BAK SA 513 Annual Report 2011.pdf

BAKER SA 514 Use of Habitat Evaluation Procedures

BAK SA 514 Annual Report 2011.pdf

BAKER SA 515 Late Seral Forest Growth

BAK SA 515 Annual Report 2011.pdf

BAKER SA 516 Mountain Goats

BAK SA 516 Annual Report 2011.pdf

BAKER SA 517 Grizzly Bear Road Management

BAK SA 517 Annual Report 2011.pdf

 

BAKER SA 602 Required Funding

BAK SA 602 Annual Report 2011.pdf