2017 Integrated resource plan
PSE’s 2017 Draft IRP was published on September 12, 2017. The 2017 Final IRP was filed with the Washington Utilities and Transportation Commission on November 14, 2017.
Information and presentations for the 2017 IRP Advisory Group meetings are available upon request. The links below provide the 2017 Final Integrated Resource Plan (IRP) documents by chapter and appendix.
2017 Final Integrated Resource Plan
-
Chapters
-
Appendix
- Public Participation
- Legal Requirements and Other Reports
- Environmental and Regulatory Matters
- Electric Resources & Alternatives
- Demand Forecasting Models
- Regional Resource Adequacy Studies
- Wholesale Market Risk
- Operational Flexibility
- Regional Transmission Resources
- Demand-side Resources Navigant Report: 2017 IRP Demand-Side Resource Conservation Potential Assessment Report
- Colstrip
- Electric Energy Storage
- Washington Wind and Solar Costs
- Electric Analysis
- Gas Analysis
- Gas Fired Resource Costs